Kratos Signs Up for Seagate Space Offshore Launch Platform With First Mission in 2027

Kratos Defense & Security Solutions has signed a long-term agreement to use the first Gateway offshore launch platform being built by Florida startup Seagate Space, and plans to fly its first mission from the sea-based pad in 2027. The San Diego company announced the deal on November 10.
Kratos said it will use the platform first for defence-related launch and target missions. Seagate Space, based in St. Petersburg, Florida, has at the same time signed its first Gateway construction contract, which moves the platform from design into physical build. Neither company disclosed the value or length of the agreement.
Kratos Books the First Gateway Platform
| Item | Detail |
|---|---|
| Launch customer | Kratos Defense & Security Solutions (NASDAQ: KTOS) |
| Platform provider | Seagate Space, St. Petersburg, Florida |
| Agreement | Long-term use of Seagate’s initial Gateway offshore launch platform |
| Value and term | Not disclosed |
| Initial use | Defence-related launch and target missions |
| First mission | Planned for 2027, with further launches expected in later years |
| Platform status | First construction contract signed; builder not named |
| Announced | November 10, 2026 |
Dave Carter, president of Kratos Defense & Rocket Support Services, said the agreement “creates an important new pathway for supporting our customers’ evolving launch and test requirements.” Chief executive Eric DeMarco put the argument more broadly: “Sea-based launch infrastructure can provide flexibility, responsiveness, and operational choice.”
The two companies said they will keep working on construction, integration and operational readiness ahead of the 2027 mission. Kratos is not presenting the platform as a replacement for the land ranges it already uses. The release describes Gateway as a complement to them, offering more freedom in launch geometry, range access and scheduling.
What Seagate Space Is Building
Gateway is a modular, mobile offshore system intended for government and commercial launch, testing and recovery work. The variant that has gone furthest through certification, Gateway-S, is a semi-submersible designed for uncrewed launch operations. Seagate describes an interlocking structure that breaks down into container-sized modules for transport, a hull form meant to reduce wave-induced motion, and dynamic positioning that holds the platform on station without anchors.
The American Bureau of Shipping granted Gateway-S approval in principle in December 2025, the first offshore asset cleared under the classification society’s new offshore spaceport requirements. An approval in principle is a feasibility check on a concept, not final class certification. Seagate has also said it tested a scale model at the MIT Sea Grant hydrodynamics laboratory.
Kratos is not the only rocket company in the queue. In April 2026 Seagate and Firefly Aerospace signed a memorandum of understanding to adapt the platform for Firefly’s Alpha orbital rocket. Sean Fortener, Seagate’s president, chief operating officer and co-founder, said the company’s vision is to “make access to space as open as the ocean itself.”
Sea Launch Then and Gateway Now
Launching from the ocean is not new. The Sea Launch consortium flew Zenit-3SL rockets from the Odyssey platform in the equatorial Pacific between 1999 and 2014. What differs here is the design and the customer, with a platform built for the job and a defence test contractor as its first announced user.
| Feature | Odyssey (Sea Launch) | Gateway-S (Seagate Space) |
|---|---|---|
| Origin | Converted semi-submersible oil drilling rig | Purpose-built modular semi-submersible |
| Rocket and mission | Zenit-3SL, commercial satellites to geostationary transfer orbit | Kratos defence launch and target missions first; Firefly Alpha under an MoU |
| Operations at launch | Crew moved to the command ship; platform unmanned during fuelling and launch | Designed for uncrewed launch operations |
| Mobility | Sailed from Long Beach to the equator for each campaign | Mobile; modules shippable by vessel, truck or rail |
| Status | Flew 1999 to 2014 | Construction contract signed; first Kratos mission planned for 2027 |
Why a Hypersonic Test Contractor Wants a Pad at Sea
Kratos builds rockets that are mostly meant to be shot at, tracked or measured. Its Defense & Rocket Support Services unit supplies ballistic missile targets, sounding rockets and hypersonic test vehicles. Its Erinyes hypersonic vehicle first flew in June 2024 on the Missile Defense Agency’s HTB-1 mission from Wallops Island, Virginia. Kratos also leads the MACH-TB 2.0 hypersonic test bed contract, which it has valued at up to $1.45 billion over five years if all options are exercised.
Work of that kind depends on range time, and fixed coastal ranges have fixed geography. A platform that can be towed to a chosen spot can open flight corridors those ranges cannot offer. That reading is analysis, not a company claim; Kratos has not said which programmes or vehicles will fly from Gateway. Readers new to the subject can find the basics in our explainer on how hypersonic missiles work.
Kratos Company Profile
| Item | Detail |
|---|---|
| Headquarters | San Diego, California |
| Founded | 1994 as Wireless Facilities Inc.; renamed Kratos in 2007 |
| Employees | About 4,300 (December 2025) |
| Revenue | $1.347 billion (fiscal 2025) |
| CEO | Eric DeMarco |
| Segments | Unmanned Systems; Kratos Government Solutions |
| Known programmes | XQ-58 Valkyrie, BQM-177A, Erinyes, Zeus rocket motors, MACH-TB 2.0, OpenSpace |
A fuller account of the business is in our Kratos company profile.
Kratos and Gateway FAQ
What did Kratos and Seagate Space agree?
A long-term agreement under which Kratos will use Seagate Space’s initial Gateway offshore launch platform. The value and duration were not disclosed.
When will Kratos first launch from the platform?
Kratos plans its first mission in 2027, with additional launches expected in later years.
What is Gateway-S?
An uncrewed, modular semi-submersible launch platform designed by Seagate Space. The American Bureau of Shipping gave the design approval in principle in December 2025.
What will Kratos launch from it?
The company said it will start with defence-related launch and target missions. It has not named specific vehicles or programmes.
Who is Seagate Space?
A St. Petersburg, Florida company developing offshore launch, recovery and logistics platforms. It also has a memorandum of understanding with Firefly Aerospace covering the Alpha rocket.
- Kratos – “Kratos and Seagate Space Partner to Advance Mobile Offshore Launch Capabilities for National Security Missions” (press release, November 10, 2026): kratosdefense.com
- New Space Economy – “Kratos Selects Seagate’s Gateway Platform for Offshore Missions Beginning in 2027” (November 11, 2026)
- American Bureau of Shipping – “ABS Approves Seagate Space’s Modular Offshore Launch Platform” (December 2025)
- WorkBoat – “Seagate Space, Firefly Aerospace plan offshore launch platform” (April 7, 2026)
- Kratos – Form 10-K for fiscal 2025
- Defense News – “Kratos’ Erinyes test vehicle logs hypersonic speeds on first flight” (July 3, 2024)
- Wikipedia – Sea Launch; Odyssey (launch platform); Kratos Defense & Security Solutions



